Most Los Angeles condo associations require written approval before a bathroom remodel, and the approval usually depends on a package that describes the scope, shows drawings, and includes the contractor's paperwork. On top of that, buildings commonly set rules for work hours, noise, elevator and parking use, debris removal, water shut-offs, sound underlayment and waterproofing. The specifics live in your CC&Rs and the association's remodeling or alteration policy, so those documents are where every condo project should begin.

Check your own documents

Every association is different, and rules get updated. Treat this as a list of what is common, then read your CC&Rs and any remodeling policy, and ask your management company what applies to your unit. A city building permit is a separate requirement; see our permit overview and confirm with your building department.

What an HOA approval package usually includes

Associations want to know three things: what you are changing, who is doing it, and how the work will affect the building and your neighbors. A typical submission covers:

  • Scope of work. A plain description: demolition extent, whether any plumbing moves, flooring type, shower or tub changes, electrical work, ventilation.
  • Drawings or a floor plan. Often a simple plan showing existing and proposed layouts. Some buildings ask for more detail if drains move or walls change.
  • Material specifications. Especially the flooring assembly and the sound underlayment product, and sometimes the waterproofing system.
  • Contractor paperwork. Many associations ask for proof of insurance naming the association as additionally insured, a state contractor license number, and signed acknowledgment of the building's rules.
  • Schedule. Start date, expected duration, and the days when noisy work or a water shut-off will happen.
  • Deposit or fees. Some buildings hold a refundable damage deposit or charge a review fee.

Allow time for the board or architectural committee to meet. Submitting a complete package the first time is the easiest way to avoid a second review cycle. Our condo bathroom remodeling service includes preparing that package with you.

Rules you will commonly run into

Work hours
Weekday daytime windows are typical, with quieter hours or no work on weekends and holidays. Demolition and tile cutting may be restricted to narrower hours.
Noise
Chipping out old mortar-bed tile is loud and carries through concrete. Some buildings limit the days on which demolition can happen.
Elevator use
Reservations for a service elevator, padded walls, and sometimes a staff member present during material deliveries.
Parking and loading
Limited or no parking for trades, loading-zone time limits, and rules about where materials can be staged.
Debris removal
Building dumpsters are usually off-limits. Contractors haul debris out themselves, often in bags or carts, and must protect hallways on the way.
Water shut-offs
If your unit can't be isolated, shutting off a riser affects neighbors. Buildings usually require advance written notice and a set window.
Sound underlayment
Hard flooring over a neighbor's ceiling often requires an acoustic underlayment meeting a performance rating the association specifies.
Waterproofing
Some associations specify or require a waterproofing membrane under shower floors and wet areas, or want to see a flood test before tile.

Owner versus association responsibility

Who owns, maintains and pays for what depends entirely on your CC&Rs, and the language varies a lot. In many buildings, the unit owner is responsible for everything inside the finished surfaces of the unit (fixtures, tile, vanity, the branch lines serving only that unit), while the association is responsible for the structure, the common walls and the shared plumbing. Where exactly the line falls on a drain line or a shut-off valve is the kind of detail worth reading closely.

This matters practically. If your remodel damages a shared line, you may be responsible for the repair. If you discover a failing riser during demolition, the association may need to fix it before your work continues. Ask management how they handle both situations before you start.

Risers, stacks and what you can't move

Most condo bathrooms sit on a vertical stack: a drain and vent riser running floor to floor, with each unit's toilet, tub and sink tying into it. The toilet is usually close to the stack for good reason. Moving it far away means a longer horizontal drain run that needs slope, and in a concrete building there may be nowhere to put it.

Supply risers often run nearby too, which is why many condo units can't shut off water to their own bathroom. Some remodels add individual shut-off valves where the building allows it, which makes future work far easier.

Slab limits on moving drains

In a wood-framed building, a drain can sometimes move within the floor joists. In a concrete building, the drain lines are often embedded in or hung below the slab, and the space below belongs to your downstairs neighbor. Cutting or coring a post-tensioned slab is usually prohibited outright or requires engineering review. The practical result: in many LA concrete high-rises and mid-rises, the shower, toilet and tub drains stay roughly where they are.

That limit also affects curbless showers. A true zero-threshold entry usually needs the shower floor recessed below the bathroom floor, which a slab may not allow. A low curb or a slight raise of the whole bathroom floor are the usual workarounds. If you are hoping to swap your tub for a shower, the condo tub-to-shower guide covers what usually works; our tub-to-shower conversion service handles the build itself.

Want someone to read your building's remodeling policy alongside your plans?

Call (213) 566-7696

Before you submit

  1. Get the current CC&Rs, rules and any remodeling or alteration policy from management.
  2. Ask whether your unit has its own water shut-offs and where the stack runs.
  3. Find out what flooring and underlayment the building requires.
  4. Ask about insurance certificate wording, deposits and review timelines.
  5. Confirm whether the association wants to see the city permit, and in which order approvals happen.

Bring those answers to your first design meeting. Knowing what the building will and won't allow before you choose tile saves a redesign later.