Open daily, 7:00 AM to 10:00 PM700 Flower St, Los Angeles, CA 90017(213) 566-7696

What we mean by luxury

In a primary bathroom, luxury is less about how much is in the room and more about how well each thing is done. A book-matched marble wall, a steam shower that actually seals, a floor that's warm at six in the morning, a vanity built to the inch for the wall it sits on. Those are the details people notice every day for years.

This kind of work asks more of the builder than a standard remodel: tighter tolerances, heavier materials, more trades in sequence and more coordination with designers, fabricators and suppliers. It also asks more of the schedule. We plan these projects with that in mind from the first meeting.

If your project is a complete renovation of a secondary bathroom rather than a primary suite, our full bathroom remodeling page is the better starting point.

Materials and systems

What goes into a primary suite

Natural stone slabs
Marble, quartzite and limestone in full slabs rather than tile, for shower walls, vanity tops and tub decks. We go to the stone yard with you or your designer to select the actual slabs, since veining and color vary from one to the next.
Book-matching
Consecutive slabs cut from the same block and opened like a book so the veining mirrors across a joint. It needs slabs reserved together and a template that plans exactly where every seam falls.
Steam showers
A steam generator, a vapor-tight enclosure, a sloped ceiling so condensation runs down the wall instead of dripping, and glass that seals to the ceiling. The waterproofing is more demanding than a standard shower, and the generator needs a serviceable location nearby.
Heated floors
Electric radiant mats set under tile, on a dedicated circuit with a programmable thermostat. They make stone floors comfortable in cooler months and help the room dry after showers.
Custom millwork
Vanities, linen towers and makeup stations built to the room, with integrated outlets, drawer organization and finishes chosen to hold up to humidity.
Plumbing fixture packages
Thermostatic valves with separate volume controls, rain and handheld combinations, floor-mounted tub fillers and matched trim across every fixture. We coordinate rough-in valves with the finish trim so nothing arrives incompatible.

Stone and large-format tile, set properly

Large-format porcelain panels and stone slabs are unforgiving. Walls have to be flat, not just plumb, and floors have to be leveled before anything is set. Heavy panels need full coverage of thinset behind them, careful handling and often more than two people.

Natural stone also has to be sealed and maintained, and some marbles etch from acidic cleaners or cosmetics. We'll talk through how a given stone ages before you choose it, so there are no surprises a year in.

For tile work across the rest of the house, see our bathroom tile installation page.

Large-format tile being set into combed thinset
Illustrative photo

Lighting

Designing light for a bathroom you use at both ends of the day

At the mirror

Light from both sides of the face, not only above it, at a color temperature that shows skin tones accurately. Sconces or integrated mirror lighting do this better than recessed cans.

In the shower and over the tub

Wet-rated fixtures, placed so they light the space without glare in your eyes when you look up.

Ambient and night

Dimmable general light, plus low-level lighting in a toe kick or under a floating vanity for night use without waking anyone.

Working together

Coordinating with architects and designers

Many primary bathrooms we build are drawn by an architect or interior designer. Our role is to turn those drawings into a room that works, raising questions early rather than on site.

  1. Drawing review

    We review plans, elevations and the finish schedule, and flag anything that affects structure, waterproofing, drain locations or rough-in heights.

  2. Site verification

    We measure the existing room and open up where needed to confirm joist direction, stack locations and wall conditions against the drawings.

  3. Procurement plan

    Long-lead items such as stone, custom glass, millwork and imported fixtures are identified and ordered first, with dates tied to the construction schedule.

  4. Mock-ups and layouts

    Tile and slab layouts are confirmed with the designer before cutting, and seam locations are agreed in writing.

  5. Build and close-out

    Regular site updates to you and the design team through construction, and a joint walkthrough at the end.

If you don't have a designer, we can guide the selections ourselves or suggest bringing one in for a larger suite.

Lead times and scheduling

A luxury bathroom's timeline is usually set by materials, not labor. Stone slabs have to be selected and templated, custom glass can only be measured once the tile is finished, millwork is built to order, and some imported fixtures take a long time to arrive. Permitted work adds plan review and inspections, which vary by city.

We sequence ordering so that nothing on the critical path is still unknown when demolition starts. It usually means a longer planning phase and a calmer construction phase. For how permit timing affects the calendar, read how permit timing affects remodeling schedules, and always confirm current requirements with LADBS or your city's building department.

Budget

What shapes the cost of a primary bathroom

Stone selection and fabrication

Slab stone is one of the larger line items, and book-matching, mitered edges and full-height walls add fabrication time.

Systems

Steam, radiant heat and new circuits add equipment, electrical work and more complex waterproofing.

Millwork and fixtures

Custom cabinetry and high-end plumbing packages vary widely; the choice of trim alone can change the plumbing budget considerably.

Layout and structure

Moving walls, relocating drains or reinforcing floors for a stone tub affect both cost and schedule.

Our estimates page explains how we price projects, and bathroom remodel ROI considerations looks at what tends to matter for resale.

Questions

Primary bathroom FAQ

Do you work with my architect or interior designer?

Yes. We review their drawings, verify conditions on site, raise technical questions early and keep them updated through construction.

What does a steam shower need that a normal shower doesn't?

A steam generator in an accessible location, a vapor-tight enclosure sealed to the ceiling, a sloped ceiling, more demanding waterproofing and a dedicated electrical circuit.

Is marble a good idea in a shower?

It can be, with the right expectations. Marble is porous and can etch, so it needs sealing and gentle cleaners. Quartzite or porcelain slabs give a similar look with less maintenance.

Why does a luxury bathroom take longer to plan?

Custom stone, glass, millwork and specialty fixtures have longer lead times, and many items can only be measured at certain stages. Ordering early keeps construction moving.

Are heated floors worth it in Los Angeles?

Many people find them worthwhile on stone or porcelain floors, especially on cool mornings and in coastal homes where rooms stay damp. They're easiest to add during a full remodel.

Call us

Talk to us about your bathroom

Call and tell us what isn’t working in the room. We’ll talk through scope, materials and timing, then set up a visit to measure and see the plumbing and structure.

Call for a consultation

(213) 566-7696

Open daily, 7:00 AM to 10:00 PM

  • Tell us whether it’s a house, condo or ADU
  • Describe which bathroom and what you’d like to change
  • We arrange a visit to measure and look at the room
Call now
Call (213) 566-7696Open daily, 7:00 AM to 10:00 PM